RATES EFFECTIVE OCTOBER 01, 2026
|
Meter Size
|
Basic Water Charge
|
Lifeline Water Consumption Per K/Gal for < 5000 Gallons
|
Water Consumption Per K/Gal for > 5000 Gallons
|
|
¾”
|
39.25
|
3.91
|
18.70
|
|
1”
|
45.81
|
3.91
|
18.70
|
|
1 ½”
|
71.87
|
3.91
|
18.70
|
|
2”
|
91.54
|
3.91
|
18.70
|
|
3”
|
163.51
|
3.91
|
18.70
|
|
4”
|
228.88
|
3.91
|
18.70
|
|
6”
|
425.03
|
3.91
|
18.70
|
|
8”
|
621.17
|
3.91
|
18.70
|
|
10”
|
850.06
|
3.91
|
18.70
|
|
12”
|
1,013.46
|
3.91
|
18.70
|
|
Meter Size
|
Basic Water Charge
|
Water Consumption Per K/GAL
|
|
¾”
|
39.25
|
23.23
|
|
1”
|
45.81
|
23.23
|
|
1 ½”
|
71.87
|
23.23
|
|
2”
|
91.54
|
23.23
|
|
3”
|
163.51
|
23.23
|
|
4”
|
228.88
|
23.23
|
|
6”
|
425.03
|
23.23
|
|
8”
|
621.17
|
23.23
|
|
10”
|
850.06
|
23.23
|
|
12”
|
1,013.46
|
23.23
|
|
Meter Size
|
Basic Water Charge
|
Water Consumption Per K/GAL
|
|
¾”
|
37.91
|
7.47
|
|
1”
|
44.26
|
7.47
|
|
1 ½”
|
69.45
|
7.47
|
|
2”
|
88.46
|
7.47
|
|
3”
|
158.00
|
7.47
|
|
4”
|
221.13
|
7.47
|
|
6”
|
410.65
|
7.47
|
|
8”
|
600.16
|
7.47
|
|
10”
|
821.30
|
7.47
|
|
12”
|
979.17
|
7.47
|
|
Meter Size
|
Basic Water Charge
|
Water Consumption Per K/GAL
|
|
¾”
|
39.25
|
7.73
|
|
1”
|
45.81
|
7.73
|
|
1 ½”
|
71.87
|
7.73
|
|
2”
|
91.54
|
7.73
|
|
3”
|
163.51
|
7.73
|
|
4”
|
228.88
|
7.73
|
|
6”
|
425.03
|
7.73
|
|
8”
|
621.17
|
7.73
|
|
10”
|
850.06
|
7.73
|
|
12”
|
1,013.46
|
7.73
|
|
Sewer Rates
|
Rate
|
|
Residential (flat Monthly Rate)
|
35.84
|
|
Commercial 1 (per 1000 gallons*)
|
12.82
|
|
Commercial 2 (per 1000 gallons*)
|
31.21
|
|
Commercial 3 (per 1000 gallons*)
|
43.27
|
|
Government and Federal (per 1000 gallons*)
|
18.31
|
|
Government Landfill Leachate (per 1000 gallons*)
|
18.87
|
|
Basic Water Charge
|
$39.25
|
|
Basic Sewer Charge
|
$35.84
|
|
Water Usage @7,360 Gals
|
$63.68
|
|
Supplemental Annuity Surcharge
|
$2.96
|
|
Total Estimated Charge
|
$141.73
|
| Description | Meter/Detail | Rate |
|---|---|---|
| Service Reconnection | 3/4″ to 1-1/2″ meters | 45.00 |
| 2″ meter and larger | 145.00 | |
| Special Reading | 15.00 | |
| Bill Analysis | 10.00 | |
| Verification time test | 45.00 | |
| Bench Test | First Test within One Year | No Charge |
| 3/4″ to 1-1/2″ meters | 85.00 | |
| 2″ meter and larger | 175.00 | |
| Fire Hydrant Fee | 25.00/month | |
| Bulk Water Sales | 3.00/Kgal | |
| Meter Relocation | at cost | |
| Return Check Charge | 30.00 | |
| Sewer Connection Permit | Residential | 50.00 |
| Commercial | at cost | |
| Government | at cost | |
| Bulk Sewage Dumping | Permit Charge | 200.00/truck |
| Discharge (<5 Kgal) | 25.00/truck | |
| Discharge(5> Kgal) | 5.00/truck | |
| Meter Installation | at cost | |
| Water Service Deposit | 3/4″ | 32.00 |
| 1″ | 37.00 | |
| 1 1/2″ | 55.00 | |
| 2″ | 73.00 | |
| 3″ | 123.00 | |
| 4″ | 178.00 | |
| 6″ | 313.00 | |
| 8″ | 378.00 | |
| 10″ | 660.00 | |
| 12″ | 773.00 | |
| Sewer Service Deposit | Residential | 20.00 |
| Commercial I | 60.00 | |
| Commercial II | 650.00 | |
| Commercial III | 1,400.00 | |
| Metered Industrial | 5,000.00 | |
| Pressure Reading | 25.00 | |
| Direct Service (Authorized By GWA) | 3/4″ | 60.00 |
| 1″ | 60.00 | |
| 1 1/2″ | 70.00 | |
| 2″ | 120.00 | |
| 3″ | 180.00 | |
| 4″ | 240.00 | |
| 6″ | 360.00 | |
| 8″ | 480.00 | |
| 10″ | 600.00 | |
| 12″ | 720.00 | |
| Illegal Connection | Basic Water Charge | Plus Estimated Water*** |
| 3/4″ | 2,500.00 | 23.23/Kgal |
| 1″ | 2,500.00 | 23.23/Kgal |
| 1 1/2″ | 5,000.00 | 23.23/Kgal |
| 2″ | 5,000.00 | 23.23/Kgal |
| 3″ | 7,500.00 | 23.23/Kgal |
| 4″ | 10,000.00 | 23.23/Kgal |
| 6″ | 12,500.00 | 23.23/Kgal |
| 8″ | 15,000.00 | 23.23/Kgal |
| 10″ | 17,500.00 | 23.23/Kgal |
| 12″ | 20,000.00 | 23.23/Kgal |
| 14″ | 22,500.00 | 23.23/Kgal |
| 16″ | 25,000.00 | 23.23/Kgal |
| Fire Hydrant | 15,000.00 | |
| Meter Tampering | ||
| Penalty | $500.00 plus Estimated Water Loss | |
| Illegal Sewage Dumping | ||
| Penalty | $500.00 |
** Based on the prevailing Water Rate at Consumption Period
| Schedule of Water System Development Charges (SDC) | 5/8 x 3/4″ | $2,126 |
| 3/4″ | $3,190 | |
| 1″ | $5,316 | |
| 1 1/2″ | $10,632 | |
| 2″ | $17,011 | |
| 3″ | $34,022 | |
| 4″ | $53,160 | |
| 6″ | $106,320 | |
| 8″ | $170,112 | |
| 10″ | $244,536 | |
| Schedule of Wastewater System Development Charges (SDC) | 5/8 x 3/4″ | $3,474 |
| 3/4″ | $5,212 | |
| 1″ | $8,686 | |
| 1 1/2″ | $17,372 | |
| 2″ | $27,795 | |
| 3″ | $55,590 | |
| 4″ | $86,860 | |
| 6″ | $173,720 | |
| 8″ | $277,952 | |
| 10″ | $399,556 |